Composition:
Polymer water dispersion, functional additives, water, biocide.
Color:
Colourless
Appearance in the container:
Opaque white liquid
Film colour:
Colourless
VOC:
Not less than 5%
Coverage*:
8−10 m²/l
Density:
about 1.0 kg/l
Recommended number of coats:
1−2
Drying time**:
2 hours
Substrate temperature during application:
from +5 °C to +35 °C
Operating temperature:
from -50 °C to +70°C
Shipping temperature:
from +5 °C to +35 °C
Shelf life:
24 months
* Material consumption depends on the quality of surface preparation and the method of application.
** at t (+20±2) °C and relative air humidity of no more than (65±5) %. If the temperature is lowered or humidity is increased, drying time may increase. At an air temperature below +15°C or relative air humidity above 65%, the next coat should be applied no earlier than after 24 hours.
Used for treating concrete, plastered, plaster and drywall surfaces, chipboard and wood fiber materials. The primer can be used indoors in areas with normal and elevated humidity. High-quality primer for interior and exterior work. Intended for dust removal and preparing the substrate for subsequent finishing (filling, painting, wallpapering, installing floor coverings). Strengthens the surface and reduces and evens out the substrate’s absorbency. Increases adhesion and reduces paint consumption by up to 15%. Protects against mold and fungi.
Available in a fixed color palette: colorless
Surface preparation:
Prepare the substrate in accordance with SP 71.13 330.2017.
The surface must be strong, clean, and dry. Before priming it is necessary to
remove from the surface any peeling elements, chalky and lime paint,
dust and other contaminants. If necessary, fill in uneven areas with putty, and then sand the dried surface.
Work procedure:
1. The surface to be processed must be dry and clean. The substrate temperature for performing the work is from +5°C. The temperature in the room during application of the paint is from +5°C to +35°C. The relative air humidity is below 80%.
2. Before use, mix until uniform; do not dilute.
3. Apply to the prepared dry, clean surface using a roller, brush, or sprayer (nozzle 0.28 mm, pressure not more than 150–170 bar).
4. For surfaces with strong absorbency, it is recommended to prime twice.
5. Painting of the primed coating is recommended no earlier than after 2–3 hours, provided the temperature conditions are +5°C and the relative air humidity is no more than 80%.
After finishing the work, thoroughly wash hands and tools with warm water.
Store and transport in tightly closed containers at a temperature of not less than +5°C and not more than +35°C. Up to five freeze-thaw cycles are permitted with a total duration of no more than 2 weeks at a temperature not below −40°C. The container with the product should be protected from excessive heating and storage in direct sunlight should be avoided. If the conditions are met, the warranty storage period in the closed factory packaging is 24 months from the date of manufacture.
The product is fire- and explosion-safe and does not contain flammable components.